Challenges
Our client conducted tank top upgrades at a facility in Baltimore, Maryland. After the tanks were exposed, there was a risk of floatation with the upcoming rain. This can cause damage to the tanks, piping and potentially lead to expensive repairs if not managed properly.
How We ACE’d It
The ACE Team quickly filled the tanks with water to prevent potential “floating” during the anticipated weather. After the weather passed, we returned to pump out 7,000 gallons of gas impacted water so it could be refilled with gas and the station reopened for service.